CN EN
Current : Home >> Case >> Bridge Engineering
Boguzi River Bridge Project of Atux, Xinjiang
Release Date:2019-01-22

As a project of “Providing Assistance for Construction in Xinjiang”, it is located in Atux City, Xinjiang. The bridge is 282 meters long and its construction costs totaled 28.5 million yuan.